• Register
  • Login
  • Subscribe
  • Contact Us

Liquidation Works for Damages Caused by Disaster in Batumi

GeorgiaTenders notice for Liquidation Works for Damages Caused by Disaster in Batumi. The reference ID of the tender is 51992084 and it is closing on 28 Apr 2021.

Tender Details

  • Country: Georgia
  • Summary: Liquidation Works for Damages Caused by Disaster in Batumi
  • GET Ref No: 51992084
  • Deadline: 28 Apr 2021
  • Financier: Self Financed
  • Purchaser Ownership: Government
  • Tender Value: GEL 1168113
  • Notice Type: Tender
  • Document Ref. No.: NAT210006297
  • Purchaser's Detail:
    Login to see full purchaser details. Login to see full purchaser details. Login to see full purchaser details. Login to see full purchaser details. Login to see full purchaser details. Login to see full purchaser details. Login to see full purchaser details. Login to see full purchaser details. Login to see full purchaser details.
  • Description:
  • Tenders are invited for Q. Liquidation Works for Damages Caused by Disaster in Batumi 1. Materials used: a) All materials used must be of high quality and meet all construction norms and standards in force in Georgia. All materials, equipment, parts, supplies, supplied under the contract, must be new, unused, standard, high quality, best designed and manufactured. Poor or low quality materials, equipment and parts will not be accepted and their use will not be allowed; Note: In the part of the tender documentation (technical conditions, cost estimate, attachment, etc.) where the trademark, model, source of origin or manufacturer of the procured materials and equipment will be given, is meant "similar" or "equivalent". 2. Procedure for performing works: The conditions of the works must comply with the rules and norms established by the current legislation of Georgia. In the process of performing the works, the bidder must ensure that the workplace is restricted and that protective warning lights and traffic lights are installed. A work log should be submitted as soon as the work begins. The executor must produce secret works acts for the works that require the production of the mentioned documentation. In order to ensure the high quality of the work performed, in accordance with the construction norms in force, the contractor is obliged to conduct in the specialized laboratory required for testing materials on all quality control laboratories for the use of materials (asphalt concrete, cement concrete, gravel, sand, bitumen, primers, etc.). Due to the above, the contractor is obliged to submit laboratory findings and recipes of the materials used (asphalt concrete, cement concrete, gravel, sand, bitumen, primers, etc.). Their quality must comply with the standards and norms in force in Georgia. The supplier is obliged to use only the asphalt-concrete plant, Whose products will have a laboratory report on the suitability of the products of this factory. Otherwise the works will not be accepted. The cost of the work for which there is a quality certificate or passport will be reimbursed under the contract. Materials should be stored indoors, except for materials that are normally stored outdoors. Supplier materials and constructions must have a passport or certificate. Their quality must comply with the standards and construction norms in force in Georgia. The executor must produce secret works acts for the works that require the production of the mentioned documentation. The executor must produce the technical documentation for the performance. Upon completion of the works, the Purchaser must submit a joint report on the completion of the project (illustrated, electronic and printed). Also, if necessary, testing of completed works should be conducted. During construction it is necessary to guide, execute and comply with Π‘HиП their requirements in labor protection and safety equipment. Workers must be provided with individual means of protection and general collective protection measures must also be completed. It is necessary to follow the safety equipment, industrial sanitation and fire-fighting rules, norms and instructions. In carrying out the work, the supplier must provide such safe and harmless working conditions for each work that the nature of the work allows. All work must be performed in accordance with local and state laws, codes, requirements and regulations relating to human safety, health and well-being. The Contractor shall ensure compliance with all the rules and instructions necessary for the safety of the work in order to avoid accidents as far as possible and to minimize the loss of his workers and other persons. There should be appropriate signs and warnings in the work area. During the works, special attention should be paid to the ground works within the framework of communications (electricity cable, gas pipeline, water pipeline, etc.). It is necessary for the owners of communications in the production area to be present and to consider their requirements. The Contractor shall take measures, take appropriate safety measures and carry out all necessary works within the framework of the contract, coordinate such works with the relevant services to protect and influence electricity, telegraph, telephone lines, natural gas wires and other utility equipment in his work area. . The costs related to the above should be borne by the executor. The executor must protect and release the customer from any claims, claims, lawsuits, From the indemnification and expenses that may arise as a result of the above impacts or in connection therewith. The contractor is obliged to properly protect all buildings, structures, equipment, communications from damage and deterioration during the term of the contract. The Contractor shall take all necessary measures to protect the building, structure, pipelines, cables, sewers, railways and other communications. In the event of a meeting of various underground communications, the contractor shall at its own expense ensure the transfer of the communication without damaging it. The executor must provide the transportation of the existing used materials with his own funds to the warehouse of the Municipal Service Agency. The supplier must ensure the existence / maintenance of existing / existing (if any) outdoor lighting in a proper condition during the reconstruction-rehabilitation and improvement works. The lighting must be switched on continuously throughout the night even if it is damaged during the work (temporary overhead power transmission lines must be used, which will remain in the ownership of the supplier). Bids accepted from: 23.04.2021 00:00 Deadline for bid submission: 28.04.2021 13:30 Bid reduction step: 11`681.00 GEL Guarantee amount: 11`681 GEL Guarantee validity period: 160 Day [Disclaimer: The above text is machine translated. For accurate information kindly refer the original document.]
  • Documents:

 Tender Notice

If you are registered member, kindly login to view full details of this tender notice:

CLICK HERE TO LOGIN

Liquidation Works for Damages Caused by Disaster in Batumi - Georgia Tender

The N (N) LP MUNICIPAL INFRASTRUCTURE AND IMPROVEMENT DIVISION, a Government sector organization in Georgia, has announced a new tender for Liquidation Works for Damages Caused by Disaster in Batumi. This tender is published on GeorgiaTenders under GET Ref No: 51992084 and is categorized as a Tender. Interested and eligible suppliers are invited to participate by reviewing the tender documents and submitting their bids before the deadline on 2021-04-28.

The estimated tender value is GEL 1168113, and full details, including technical specifications and submission requirements, are provided in the official tender documents. Ensure all submissions meet the criteria outlined to be considered for evaluation.

GeorgiaTenders Features

GeorgiaTenders Features

Fresh and verified Tenders from Georgia. Find, search and filter Tenders/Call for bids/RFIs/RFPs/RFQs/Auctions published by the government, public sector undertakings (PSUs) and private entities.

  • 1,000+ Tenders
  • Verified Tenders Only
  • New Tenders Every Day
  • Tenders Result Data
  • Archive & Historical Tenders Access
  • Consultants for RFI/RFP/RFQ
  • Tender Notifications & Alerts
  • Search, Sort, and Filter Tenders
  • Bidding Assistance & Consulting
  • Customer Support
  • Publish your Tenders
  • Export data to Excel
  • API for Tender Data
  • Tender Documents
Tender Experts

Get A Call From Tender Experts

Fill out the form below and you will receive a call from us within 24 hours.

Thank You for Contacting GeorgiaTenders !!
Email Id is already exist !!
Captcha Image
Invalid Captcha !

Get FREE SAMPLE TENDERS from Georgia in your email inbox.

  Chat with us